Our Project: Timeline

Follow the progress of Green Machine / Blue Space.

Click on the images to view additional pictures from our photo gallery.

 
     
01/02/04 Charrette  
  Charette  
  Design Opening 01/04/04
  Design opening  
11/05/04 Arrival of the Shipping Container  
  Arrival of the shipping container  
  Agriboard Arrival 04/18/05
  Agriboard arrives  
04/19/05 Cutting Green Machine Walls  
  Cutting Green Machine walls  
  Green Machine Framing 04/23/05
  Green Machine framing  
05/14/05 Started Construction of Blue Space  
  Blue Space construction  
  Hydrogen Delivery 05/17/05
  Tar Paper and Windows  
06/13/05 Mike Wassmer Site Visit  
  Mike Wassmer visits NYIT  
  Blue Space Roof Installation 06/18/05
  Blue Space roof installation  
07/17/05 Tar paper on Blue Space - Started Windows  
  Tar paper installation  
  Started Seam Metal Roof 07/23/05
  Seam metal roof work begins  
07/17/05 Fuel Cell Commissioned  
  Greg Sachs and David Schieren commission the fuel cell  
  All Windows Installed 08/20/05
  Windows installed  
08/27/05 Siding Installed  
  Siding installed  
  Breezeway Installed 09/07/05
  Breezeway installed  
09/08/05 Energy Systems on Construction Site  
  Electrolyzer  
  Roof Garden Plants on Construction Site 09/10/05
  Roof Garden plants  
09/16/05 Loft Installed  
  Loft installed  
  Photovoltaics Installed 09/18/05
  Photovoltaics installed  
09/27/05 Moving Green Machine / Blue Space to D.C.  
  Disassembly of Green Machine Blue Space  
   